Berths Particulars at Mormugao Port as on 31.03.2024 | ||||||
S. No. | Nomenclature of berths | Type of Berth | Designe d/ Depth (Mtrs.) | Permi ssible draft (mtrs.) | Quay length (Mtrs.) | Remarks |
1 | Berth No.1 | Non Cargo | 10.50 | 9.50 | --- | Not in Operation |
Berth No. ,2 | ||||||
Berth No.3 | ||||||
2 | Berth No.4 | Non Cargo | 8.00 | 7.00 | 194 | Allotted for berthing of FERRIES, RO-RO,ROPAX |
3 | Berth No.5 Berth No.6 | Break bulk cargo Coal, Coke | 14.10 | 13.00 | 210 | Operated by PPP Operator M/s SWPL LOA 200 mtrs. Capacity -2.2. MTA |
4 | 14.10 | 14.00 | 240 | Operated by PPP Operator M/s SWPL LOA 240 mtrs Capacity -17.40 MTA. | ||
5 | Berth No.7 | Coal/Coke | 14.10 | 14.00 | 300 | Operated by PPP Operator M/s AMPTPL LOA 280 mtrs Capacity -13.70 MTA. |
6 | Berth No.8 | POL, other liquid cargo | 13.10 | 13.00 | 50 | LOA 300 mtrs Capacity – 5.20 MTA |
7 | Berth No.9 and Jetties | General Cargo | 14.10 | 14.00 | 222 | Proposed for Dry dock and ship repair yard on PPP basis |
8 | Berth No.10 | Gen. Cargo /POL | 13.10 | 12.50 | 250 | Presently Operated by Port LOA 215 mtrs Capacity -3.20 MTA. Concession agreement signed for O&M on PPP basis |
9 | Berth No.11 | Gen. Cargo | 13.10 | 12.50 | 270 | Presently Operated by Port LOA 225 mtrs Capacity -3.20MTA. Concession agreement signed for O&M on PPP basis |
10 | Break Water Berth | Cruise Vessels | 9.50 | 9.00 | 450 | Cruise Terminal and Partly leased to Coast Guard LOA 300 mtrs |
11 | Mole Berth | Defence Vessels / Coast Guard vessels | 9.50 | 9.00 | 250 | Leased to Navy / Coast Guard |
12 | Mooring Dolphins + outer Anchorage by Transhippers | Operated by Port Capacity -18.50 MTA. | ||||
a | 1 | Dry bulk | 14.10 | 13.10 | 340 | |
b | 2 | Dry bulk | 14.10 | 13.10 | 340 | |
c | 3 | Dry bulk | 14.10 | 13.10 | 340 | |
d | 4 | Dry bulk | 14.10 | 1 3.10 | 340 | MD 4,5 & 6 not in operation |
e | 5 & 6 | Dry bulk | 14.10 | 13.10 | 360 |